
Registration & documentation
Label it before you lift it.
Pre-dismantling asset registration: every line and equipment component inventoried, labelled, and recorded. This is physical documentation — not customs paperwork.
What it is
Before dismantling begins, we inventory the line. Components are tagged, condition and configuration are written down, and connections are marked as found.
The point is reassembly: the new hall should receive a traceable kit, not an anonymous one. Import/export filings are a different discipline and are not this service.
The register
01
Walk the line
Identify every module, tool, and media connection.
02
Tag and photograph
Physical labels tied to the inventory.
03
Record condition
As-found state, not an as-designed wish.
04
Lock the sequence
Dismantling order follows the register, never the other way around.
What the register prevents
- Missing pieces at the destination
- Guesswork on cable and hose routes
- Lost tooling and unmatched guards
- A rebuild that cannot be audited
Request a quote
Tell us what has to move.
Moving a factory, planning an installation, searching for machinery or documenting a site? Share the essentials and let’s discuss the right scope.
Office
Am Ohlenberg 19, 64390 Erzhausen, Germany
Hours
Monday–Friday: 8:00 AM–5:00 PM







